- Customer: Public Service Company of Oklahoma
- Owner and operator: FPL Energy
- Location: Near Weatherford in Custer County
- Area: Approximately 3,800 acres
- Capacity: 106.5 megawatts (106,500 kilowatts), enough power for more than 31,000 homes
- Turbines: 71, supplied by GE Energy, each with a capacity of 1.5 megawatts (1,500 kilowatts)
- Height: 262 feet at the hub in the center of the blades
- Blade length: 126 feet
- Wind speeds for operation: 8 to 56 mph
- Optimum wind speed for power generation: 25 to 35 mph
- Date in service: April 2005
Expansion
- Area: Approximately 1,400 acres
- Capacity: 40.5 megawatts (40,500 kilowatts)
- Turbines: 27, each with a capacity of 1.5 megawatts (1,500 kilowatts)
- Projected date in service: December 2005
|
|